For one of our clients, Hein Heun Sloopwerken B.V. has been assigned to fully dismantle an retail store branch in Arnhem at the Heerlenstraat. We have completely hull dismantled and disassembled this store, with the floor as its only exception. The proceedings had to take place because the store received an new shopping formula and needs an new layout. For this cause, the store needed to be mirrored.
In the building we have removed everything including all (interior) walls, ceiling, grid, the technical installation including the toilet groups, kitchen and accessories such as the central heating and the cableducts. We have made envelopes in the floor for the installation of walk-in mats. Finally, we have removed the advertising boarding from the outside wall for the installation of new advertising lighting.
Video
More information



















