Recently Hein Heun remediated asbestos from a store premises in Haaksbergen. The asbestos-containing material, floor covering and sheet material, was located on both the ground floor and the first floor. Containments have been built at both locations. Due to the time constraints, the risk class 2A application was released with a mobile electron microscope, also known as mobile SEM, resulting in a time saving of 24 hours.

The two containments have been remediated in shifts. Due to this working method, the renovation of the store did not stagnate.




More information