For one of our clients, Hein Heun Abbruchunternehmen GmbH was assigned to dismantle the wooden construction in an branch in Apolda, in the former East Germany. The building covers an area of approximately 900 m². The wooden frame has been installed in the building (steel construction) for the design of the store and the ceiling.
The entire wooden interior has been completely dismantled and removed in a professional manner. The woodwork is preserved for reuse by the property owner. See below the film material of the building before and after the total dismantling.
Film material from before the dismantling:
Film material results after the dismantling:
Video
More information












